These are the IPT's we have established as of Saturday 9/14.

For those interested in SolidWORKS, which is encouraged, go to the Resources Page and find the SolidWORKS link. People have learned this in an hour; If you have time, go for this, as it can definitely been more efficient and accurate than making a scaled drawing.

Also, make a page for each of these IPT's on this wikispaces page and link it next to the name of the IPT.

These are the requirements for each IPT:

1) Mass, in excel

2) Dimensions

3) Scaled drawing and/or...

4) CAD (encouraged)

5)Analysis of Capability (Requirements, Physics Calculations)

6) Materials

Reference:

Weights and Measurements


We will have a status meeting Thursday, 9/19, at Jordan. Be very close to finished with all of these requirements by then. On Friday, 9/20, your finished product is due; meeting at Jordan!!! Be prepared for Analysis of Alternatives.


Claw:

2-item claw: PJ, Wil, Zhong

1-item claw: Megan, Joshua

static claw/hook: Jon

other: Pooja

Arm:

igus-sliding arm: Joseph, Brandon

multi-elbow arm: Farita, Mustafa Multiple Elbow Arm

wheel slider arm: David

telescoping screw: Adams

Base:

rotating base: Galen, Godwin

static/elevated base: Jerry

other: John


Goals and Deadlines:

Base:

First Deadline: Saturday 9/28

Validate Design
Build prototype
Test and tweak

Second Deadline: Friday 10/4

Build final base

Arm:

First Deadline: Saturday 9/28

Validate Design
Build prototype
Test and tweak

Second Deadline: Friday 10/4

Build final arm

Claw:

First Deadline: Saturday 9/28

Validate Design
Build group of servos
Prototype claw
Test and tweak

Second Deadline: Friday 10/4

Build final claw

Deadline for Integration of entire robot: Saturday 10/5

Practice/Program: two weeks, until Saturday 10/19